London's data-centre power demand

Operating demand beside the capacity already requested from the electricity grid.

Embed this viewUpdated 2 Aug

Data access

Use the machine-readable JSON record or the flattened CSV download or the compact Markdown version.

Methodology

The GLA reports 99 operating sites delivering around 760 MW and a grid connection queue around ten times current capacity. The queued value is therefore shown as an approximate 7,600 MW derived estimate: it is requested capacity, not consented, built or inevitable demand.